Photo report | November, 2024 | Felicity residential complex
09.12.2024
- completed the construction of the pit of sections 1.1 and 1.2
.
- completed the arrangement of concrete preparation for the foundation slabs of sections 1.1 and 1.2
- completed the installation of the floor slab of the 7th floor of sections 1.3 and 1.4
- Installation of vertical structures of the 8th floor of sections 1.3 and 1.4 has begun
- work has begun on the installation of brickwork on the 2nd floor of sections 1.3 and 1.4