Symbol

location 4-A, 4-B Trilovskoho St. (Sykhiv district)
from 1 450m2
Comfort+
Status. The project is completed
Sections 2 sections, 10 floors
img img
Areas 41m² - 86m²
img Commercial premises
img Underground parking with access to elevators

Small apartment complex in the favorite area of Lviv!

Qualitative and restrained architecture of modern Lviv, hidden from noisy avenues and surrounded by a fully formed and self-sufficient infrastructure of Sykhiv.

It is comfortable and cozy here - and these are the bright advantages of the SYMBOL residential complex, but not the only ones. Because SYMBOL is a business light class real estate in an ideal location. These are 10 floors of comfort among the bustle of the city, where every resident feels not in a faceless high-rise building, but in an aesthetic, high-quality and thoughtful  "home". And the "home" begins with a spacious designer hall with  exquisite furnishings and  decor in pastel colors. 

Because the new quality of life looks like this. And we are convinced that it suits you like no other!  

Choose an apartment
img

SYMBOL residential complex is a new level of quality of your life within one neighborhood.

SYMBOL residential complex is a new level of quality of your life within one neighborhood.

5 reasons to choose Symbol :

1.

ARCHITECTURE AND DESIGN

A small apartment complex where you will not feel like a resident of an “ant hill”. Modern yet restrained architecture is combined with the best European practices. As for the design, we have developed a practical style for interior groups, which is at the same time as harmonious as possible.

2.

Developed infrastructure

A great advantage that will provide you with peace, comfort and comfort is the absence of nearby buildings, but instead there is a fully formed high-quality infrastructure around.

3.

ENVIRONMENT AND LOCATION

SYMBOL is located away from noisy avenues. However, its residents can get to everything they need in a matter of minutes: kindergartens and schools, supermarkets, restaurants and entertainment venues, public transport and everything else they need for a comfortable life.

4.

QUALITY AND RELIABILITY

We work only with high-quality materials, reliable contractors and comply with all construction standards.

5.

COMFORT AND SAFETY

Completely closed area with round-the-clock video surveillance system. Underground parking with direct access to elevators. In addition, the parking lot will serve as a reliable shelter during an air raid, as it is equipped accordingly.

icon Parks 20 min walk

Sykhivskyi Park 20 min on foot (1.7 km)

icon Kindergartens 3 min walk

Kindergartens №40 3 min on foot (230 m)

Kindergartens №130 3 min on foot (230 m)

icon Medical facilities 8 min walk

Pharmacy 8 min walk (550 m)

icon Shopping center 7 min walk

ATB supermarket 7 min walk (550 m)

icon Sports and entertainment 20 min walk

Sportlife 20 min on foot (1.5 km)

icon Schools 2 min walk

School №1 2 min walk (210 m)

img img
2021 At the design stage img
IV quarter 2022 Start of construction and sales img
2023 - 2024 Construction continues img
IV quarter 2024 Final stage img
I quarter 2025 Commissioning img
Photo report | April, 2025 | Symbol RC

Photo report | April, 2025 | Symbol RC

April brought a feeling of the final straight: the Symbol construction site is gradually turning into a full-fledged living..
07.05.2025
Photo report | March, 2025 | Symbol RC

Photo report | March, 2025 | Symbol RC

One step closer to completion! In March, SYMBOL completed a number of important works that bring the complex closer to full..
07.04.2025
Symbol RC is officially commissioned!

Symbol RC is officially commissioned!

We have great news for our future residents – the Symbol residential complex has been successfully commissioned! Certificate..
14.03.2025
Photo report | February, 2025 | RC Symbol

Photo report | February, 2025 | RC Symbol

The Symbol residential complex is approaching the final stage of work. In February, the following works were performed at..
10.03.2025
Photo report | January, 2025 | RC Symbol

Photo report | January, 2025 | RC Symbol

The Symbol residential complex has started a new construction season with an active pace of work. In January 2025, a number..
06.02.2025
Photo report | December, 2024 | Simore residential complex

Photo report | December, 2024 | Simore residential complex

12.01.2025
Photo report | November, 2024 | Symbol residential complex

Photo report | November, 2024 | Symbol residential complex

- completed the construction of the pit of sections 1.1 and 1.2 . - completed the arrangement of concrete preparation for..
09.12.2024
Photo report | October, 2024 | RC Symbol

Photo report | October, 2024 | RC Symbol

We have great news about the progress of the construction of Symbol RC in October! The elevator in the first section has..
05.11.2024
Photo report | September, 2024 | Symbol residential complex

Photo report | September, 2024 | Symbol residential complex

Incredibly productive - that's what September was like at the construction site of the Symbol residential complex. Our builders..
30.09.2024
Photo report | August, 2024 | RC Symbol

Photo report | August, 2024 | RC Symbol

Photo report from the construction site of the SYMBOL residential complex for August 2024 from KREDO development:
31.08.2024
Photo report | July, 2024 | Symbol residential complex

Photo report | July, 2024 | Symbol residential complex

Photo report from the construction site of the SYMBOL residential complex for July 2024 from KREDO development:
31.07.2024
Photo report | June, 2024 | RC Symbol

Photo report | June, 2024 | RC Symbol

Photo report from the construction site of the SYMBOL residential complex for June 2024 from KREDO: Completed the..
30.06.2024
Photo report | May, 2024 | RC Symbol

Photo report | May, 2024 | RC Symbol

Photo report from the construction site of the SYMBOL residential complex for May 2024 from KREDO: Plastering works..
30.05.2024
Photo report | April, 2024 | RC Symbol

Photo report | April, 2024 | RC Symbol

Photo report from the construction site of the SYMBOL residential complex for April 2024 from KREDO: We have completed..
30.04.2024
Photo report | March, 2024 | RC Symbol

Photo report | March, 2024 | RC Symbol

Photo report from the construction site of the SYMBOL residential complex for March 2024 from KREDO: We have completed..
30.03.2024
Photo report | February, 2024 | Symbol residential complex

Photo report | February, 2024 | Symbol residential complex

Photo report from the construction site of the SYMBOL residential complex for February 2024 from KREDO: Completed..
28.02.2024
Photo report | January, 2024 | RC Symbol

Photo report | January, 2024 | RC Symbol

Photo report from the construction site of the SYMBOL residential complex for January 2024 from the Credo company: Completing..
31.01.2024
Photo report | December, 2023 | RC Symbol

Photo report | December, 2023 | RC Symbol

Photo report from the construction site of the SYMBOL residential complex for December 2023 from the Credo company: Completed..
31.12.2023
Photo report | November, 2023 | Symbol residential complex

Photo report | November, 2023 | Symbol residential complex

Photo report from the construction site of the SYMBOL residential complex for November 2023 from the Credo company: We..
30.11.2023
Photo report | October, 2023 | RC Symbol

Photo report | October, 2023 | RC Symbol

Photo report from the construction site of the SYMBOL residential complex for October 2023 from the Credo company: Completed..
31.10.2023
Photo report | September, 2023 | Symbol residential complex

Photo report | September, 2023 | Symbol residential complex

Photo report from the construction site of the SYMBOL residential complex for September 2023 from the Credo company: The..
30.09.2023
Photo report | August, 2023 | RC Symbol

Photo report | August, 2023 | RC Symbol

Photo report from the construction site of the SYMBOL residential complex for August 2023 from the Credo company: The..
31.08.2023
Photo report | July, 2023 | Symbol residential complex

Photo report | July, 2023 | Symbol residential complex

Photo report from the construction site of the SYMBOL residential complex for July 2023 from the Credo company: The..
31.07.2023
Photo report | June, 2023 | RC Symbol

Photo report | June, 2023 | RC Symbol

Photo report from the construction site of the SYMBOL residential complex for June 2023 from the Credo company: The..
30.06.2023
Photo report | May, 2023 | RC Symbol

Photo report | May, 2023 | RC Symbol

Fresh photo report for May 2023 from the Credo company on the construction of the SYMBOL residential complex: Concrete..
31.05.2023
Photo report | March, 2023 | RC Symbol

Photo report | March, 2023 | RC Symbol

We share a fresh photo report for March 2023 on the construction of the SYMBOL residential complex: All vertical..
31.03.2023
Photo report | February, 2023 | Symbol residential complex

Photo report | February, 2023 | Symbol residential complex

Despite the difficulties of February, we continued to work with enthusiasm and professionalism. Today we would like to tell..