Simore

location 13 Lyubomyr Romankiv str. (Frankivsk district)
from 2 750m2
Premium class
Status. Construction is ongoing
Sections 1 building, 6 floors, 43 apartments
img img
Areas 101m² - 145m²
img 1 commercial premises
img Underground pakring

Small apartment complex in the favorite area of Lviv!

Whatever task you set for your home, consider that the SIMORE clubhouse has already fulfilled it for you.

After all, this living space is designed for special and demanding owners of exceptional taste and desire to own exclusive. Therefore, there is no room for compromise in quality, materials, design and service. There is only room for perfection.

We are sure that you have carved each of the facets to perfection along the way. And we took you as an example, having thought this home through to the smallest detail. For the SIMORE project, we have found a place that will suit your pace of life. The close proximity to the city center is combined with the coziness of a quiet Lviv street.
 SIMORE — for those who see more.

Choose an apartment
img

SIMORE is a place where benefits become the norm.

SIMORE is a place where benefits become the norm.

4 reasons to choose SIMORE:

1.

Safe and private

The land plot is privately owned, and the territory of the house is closed and will be under round-the-clock security and video surveillance. We will also build a private underground shelter in accordance with the new construction standards.

2.

Stylish and sophisticated

Modern architectural solutions and comfortable low-rise buildings. Designer lobby with concierge service and lounge area. Ergonomic layouts with private terraces. Exclusively premium content and materials.

3.

Thoughtful and convenient

SIMORE residents will have their own gym and children's room on the ground floor. As well as underground parking for each apartment with elevator access.

4.

Ideal location

The house is located on a cozy street, 2 steps from the heart of Lviv. The city center, Stryiskyi Park, schools, kindergartens, and shopping centers are within walking distance.

icon Parks 20 min walk

Stryiskyi Park 20 min on foot (1.5 km)

Bohdan Khmelnytsky Park 20 min on foot (1.5 km)

icon Higher education institutions 9 min on foot

National Forestry University 9 min on foot (550 m)

Lviv Polytechnic National University 23 min by car (1.9 km)

icon Schools 11 min walk

Private school Lviv British School 11 min on foot (750 m)

Lyceum of International Relations named after V. Stus 13 min on foot (900 m)

Private School of the Free and Indifferent 14 min by car (3.3 km)

Lviv secondary school of I-III degrees № 50 9 min by car (1.3 km)

icon Shopping center 8 min walk

Silpo supermarket 8 min by car (1.6 km)

SHOco 11 min on foot (750 m)

Auchan supermarket 12 min by car (2.7 km)

Lion's Castle Restaurant 21 min on foot (1.4 km)

icon Sports and entertainment 18 min on foot

LEOLEND sports and entertainment complex 18 min on foot (1.3 km)

Sport Life 13 min by car (2.9 km)

icon Medical facilities 15 minutes by car

Medical Plus Clinic 15 min by car (5.7 km)

St. Paraskeva Medical Center 15 min by car (5.7 km)

icon Kindergartens 10 min walk

Kindergarten Forty Feet 10 min on foot (650 m)

Private kindergarten We love Kids 4 min by car (1.1 km)

Kindergarten №18 6 min by car (1.4 km)

img img

Огляд 360

img-360

Start

map360
arrow-left arrow-left arrow-left
2023 At the design stage img
II quarter of 2024 Start of construction and sales img
2024 - 2026 Construction continues img
III quarter of 2026 Final stage img
IV quarter of 2026 Commissioning img
Photo report | April, 2026 | RC Simore

Photo report | April, 2026 | RC Simore

Construction progress of the SIMORE club house — April: – Installation and glazing of window structures on floors 2–6 are..
01.05.2026
Photo report | March, 2026 | RC Simore

Photo report | March, 2026 | RC Simore

Construction progress of the Simore club house: – Installation and glazing of window structures on floors 2–6 are 80% complete  ..
09.04.2026
Photo report | February, 2026 | RC Simore

Photo report | February, 2026 | RC Simore

Simore Clubhouse Construction Progress – February: – Installation and glazing of window structures on floors 2–6 is 60..
09.03.2026
Price increase in clubhouse Simore

Price increase in clubhouse Simore

01.03.2026 — scheduled price increase at the Simore club house. Simore is a space for those who choose tranquility, privacy..
19.02.2026
Photo report | January, 2026 | RC Simore

Photo report | January, 2026 | RC Simore

Construction progress of the Simore club house in January: – Installation and glazing of window structures on floors 1–6..
06.02.2026
Photo report | December, 2025 |  Simore RC

Photo report | December, 2025 | Simore RC

Construction progress of the Simore club house for December: – Completion of masonry works for walls and partitions — 100%. ..
14.01.2026
Photo report | November, 2025 | Simore RC

Photo report | November, 2025 | Simore RC

Construction progress of the Simore Club House for October: - Wall and partition masonry of the 6th floor has been completed..
05.12.2025
Photo report | October, 2025 | Simore RC

Photo report | October, 2025 | Simore RC

Construction progress of the Simore Club House for October: - Wall and partition masonry of the 6th floor has been completed..
05.11.2025
SIMORE — winner of the International Property Awards 2025–2026

SIMORE — winner of the International Property Awards 2025–2026

A project that embodies modern architecture, aesthetics and balance of space. This year, SIMORE received three awards at..
29.10.2025
Photo report | September, 2025 | Simore RC

Photo report | September, 2025 | Simore RC

Construction progress of the Simore Club House for September:  – Completed 50% of the masonry works for walls and partitions..
07.10.2025
Photo report | August, 2025 | Simore RC

Photo report | August, 2025 | Simore RC

In August, the construction of the Simore club house moved forward with confidence, so let’s start with the interior works..
11.09.2025
Photo report | July, 2025 | Simore RC

Photo report | July, 2025 | Simore RC

In the heart of Lviv’s Frankivskyi district, the silhouette of the SIMORE club house has already taken shape. Another month..
07.08.2025
Photo report | June, 2025 | Simore RC

Photo report | June, 2025 | Simore RC

June is the month when summer can be felt in every breath of the city. The SIMORE residence continues to grow, remaining..
07.07.2025
Photo report | May, 2025 | Simore RC

Photo report | May, 2025 | Simore RC

May is the month when dreams come even closer to reality. SIMORE is all about the rhythm of a modern city combined with comfort..
12.06.2025
Photo report | April, 2025 | Simore RC

Photo report | April, 2025 | Simore RC

Last month at the Simore construction site was marked by dynamic work: the pace is increasing, as are the floors of your..
08.05.2025
Photo report | March, 2025 | Simore RC

Photo report | March, 2025 | Simore RC

The construction of the SIMORE clubhouse is gaining momentum, and each stage adds new touches and perfection to the project..
01.04.2025
Hurry up to fix the favorable price! From March 31 - price increase in SIMORE!

Hurry up to fix the favorable price! From March 31 - price increase in SIMORE!

Dear investors! We would like to inform you that from March 31, 2025, there will be a planned price increase in the SIMORE..
19.03.2025
Photo report |  February, 2025 | Simore RC

Photo report | February, 2025 | Simore RC

The construction of the Simore clubhouse is confidently moving forward. February was marked by active work at several key..
07.03.2025
Photo report | January, 2025 | RC Simore

Photo report | January, 2025 | RC Simore

In January 2025, the construction of the Simore residential complex continues to develop actively. The installation of..
04.02.2025
Photo report | December, 2024 | Simore residential complex

Photo report | December, 2024 | Simore residential complex

Completed the floor slab of the 2nd floor Completed vertical structures of the 3rd floor Completed the floor slab of..
12.01.2025
Photo report | November, 2024 | Simore residential complex

Photo report | November, 2024 | Simore residential complex

09.12.2024
Photo report | October, 2024 | Simore residential complex

Photo report | October, 2024 | Simore residential complex

Important results have been achieved at the construction of the Simore residential complex! The parking lot ceiling and..
05.11.2024
Photo report | September, 2024 | Simore residential complex

Photo report | September, 2024 | Simore residential complex

We offer to review the results of September in the construction of the Simore residential complex. Our team has completed..
30.09.2024
Photo report | August, 2024 | Simore residential complex

Photo report | August, 2024 | Simore residential complex

We hope that your summer was as productive as the construction team of Simore. Next - the construction stages, with which..
29.08.2024
Photo report | July, 2024 | Simore residential complex

Photo report | July, 2024 | Simore residential complex

On the stages of construction of the Simore residential complex, as of July, 2014. We have completed the installation of..
31.07.2024

Personal consultation

Our manager will contact you shortly
By clicking the button, you accept privacy policy and consent to the processing of personal data
close
Back to top